By Russell Lowes, 11/18/2014

The Obama administration is already doing all it can realistically do. Despite its “all-of-the-above” façade, it favors nuclear power. To start with, the Energy Department is essentially a nuclear department. Professor Moniz is [was] Secretary because of his nuclear ties. DOE’s national laboratories are basically nuclear labs. It organizes international nuclear R&D groupings to encourage worldwide commitment to nuclear power. The Obama administration has created an inter-departmental Team USA, including State and Commerce, specifically to encourage domestic nuclear industry by promoting nuclear exports. The White House dedicates a staffer to this task. Secretary Moniz emphasizes his commitment to “jumpstart” the U.S. nuclear power industry. DOE subsidizes new domestic nuclear plants through loan guarantees. The nuclear Navy provides government-trained operating personnel. And to facilitate the licensing of new plants, and extend licenses for existing ones, the administration’s appointments to the Nuclear Regulatory Commission have ensured that it remains industry-friendly.

–Victor Galinsky, ex-NRC Commissioner, National Journal, February 2014

We keep hearing from certain people that nukes are essential to solve energy and global warming problems. They say that nuclear energy is carbon-free, or some say low-carbon. They are neither. They say that nuclear is low-cost. They say building another round of nuclear reactors is essential for the U.S. and the world. It is neither low-cost nor essential. To build more megawatts of nuclear energy would be a mega-distraction.

Such an emphasis would weaken our response and ability to stem future climate chaos. I will take on the mission here of showing how the horrendous costs of nuclear energy makes this source an unpractical one. It is especially unpractical now, during our quest to truly course-correct on climate change.

The bottom line is that electricity generated from new nuclear reactors is about 24 cents per kilowatt-hour. About this 24 cents per kilowatt-hour:

1)    This is double the electricity price for the U.S. on average .

2)    The cost of 24¢ for nuclear electricity is more than twice the 10¢ cost of solar electricity in Arizona, about twice the national average for solar.

3)    It is more than twice the cost of wind-generated and delivered electricity.

4)    Most important, nuclear electricity is 8 times the 3¢ national average cost of energy efficiency.

5)    It is about twice the cost of new coal and gas-generated electricity.

You might ask, well how do we know how expensive a reactor will be? We have nuclear plants scattered across the nation, so how much did these plants cost in the last round?

First, I have been using empirical analysis of the cost of nuclear energy since 1977. We used regression analysis in a book released in 1979. This book was instrumental in convincing investors to pull out of the Palo Verde Generating Station Units 4 & 5, America's largest nuclear plant, west of Phoenix. Our analysis projected the cost of the Palo Verde to be $6.1 billion in 1986 actual completion dollars. The managing utility company, Arizona Public Service Co. (APS), projected $2.8 billion at the same time, and they never waivering on its projection until construction was well under way. 

That down-graded plant of 3 reactors was finished for $5.9 billion. The APS projection was overrun in costs by 111%, while our projection was slightly over the final cost by less than 4%. Of all the reactor projections done across the land that we could find, ours was the most accurate nuclear reactor projection in the nation.

We used empirical approach to costing reactors, with regression and other modeling techniques. Apparently APS used the tried and true method of sales pitch estimation.

So how do we jump from then, when the final reactor at PVNGS was completed in 1986 to now? The method I use is four-fold.

1)    First, find out what the average cost of the last rush of reactors, which happened around 1987;

2)    Then apply general inflation to that cost to bring it up to today’s cost;

3)    Third, apply a projected inflation to the year that a new reactor might be completed; and

4)    Finally, weigh a series of factors that might increase or decrease this figure.

For step 1, a low/conservative estimate on reactor average cost for 1988 was $3100 per kilowatt of net plant size.

Putting that $3100 into 1987 dollars at the U.S. Bureau of Labor Standards inflation calculator yields $6105 per kilowatt of electrical capacity in 2013 dollars.

For Step 3, I project a common 4% inflation rate through 2022, the first year it is likely for the next small group of reactors in the U.S. to be completed. This yields a completion cost in 2022 of $8689/kWe.

For Step 4, I have come up with a survey of 27 reactor construction cost factors. This is the most varied and numerous list of items I have seen, so far, from all my reading on reactor costs. I estimate that the reactors of the early 2020s will cost about 20% more than the reactors finished in the last big wave of the mid-late 1980s.

In this 4th step, I have considered factors that would make nukes cheaper than in the real (inflation adjusted) dollars of the past, like labor cost declines in America. I have also taken into consideration factors that would increase the costs like certain material cost increases, and increases in plant robustness requiring more cement, copper, steel, etc.

After comparing the changing conditions since the time the last reactors were completed, I have come to what I consider a fairly accurate projection.  It probably won’t be as accurate as our PVNGS <4% accuracy level, but I am fairly sure it will be in the ball park.

After going through this process, the final figure I project for the next round of nukes built in 2022 is $9149/kilowatt of plant size. This is in sharp contrast to most sales pitches from utilities today, where they project more like $4000 per kWe. It would be good to remember that the average overrun was 220% in the last round. They sell these plants by unrealistically lowballing the construction cost.

What does that come out to in cost per kilowatt-hour? Just like with solar and wind, you can break this down to the kilowatt-hour of electrical capacity (kWe) level, and then apply production time (hours) to it to get kilowatt-hours of electricity delivered (kWhe). You can also multiply these kWe units to the typical sizes of the wind turbines, solar panels, or coal or nuclear plants.

Here are the calculations.

This is what it would cost roughly, to install 100 reactors in the U.S., a figure being brought up from time to time by members of Congress.

$9149/kWe

X 1,350,000 kWe plant size

= $12.351 billion

X 100 reactors occasionally proposed

= $1.2351 trillion total construction cost for 100 reactors

X 14% loan payback per year (capitalization rate)

= $172.9 billion per year for 30 years

X 30 years

= $5.187 trillion paid just for construction and loan and tax expenses, not counting fuel or operation & maintenance, nor transmission and distribution.

That $172.9 billion/year will cost the average person in the U.S. (assuming an average of 350 million people into the future):

$494/person/year for 30 years if we have a 350 million population, or

$988/taxpayer/year if we have 175 million taxpayers.

 

So, how do we get to cost per kilowatt-hour? For each kilowatt of plant capacity, you can calculate the cost to construct, the capital cost and then calculate the electricity the plant produces over a typical 40 years (before major costs of renovation add to the equation). Then simply divide the capitalization cost by the kWhe. Here we go (simply). . .

——————

Cost Portion of the Equation:

$9,149/kWe

X 14% capitalization rate =

$1,281 in capital cost/year

X 30 years

= $38,426 capital payback over 30 years for each kWe of size – This is just the total capital cost over 30 years.

——————

Electrical Output Portion of the Equation:

1 kWhe

X 8766 hours/year on average

X 85% average capacity factor (electrical performance) over the life of the reactor

X 40 years

= 298,044 kWhe over 40 years – THIS is the e output over 40 years. Note that the capital payback is 30 years and the plant runs for a projected 40 years (before major capital upgrade, if it runs longer).

——————

The Final Capital Cost/kWhe Calculation:

$38,426 Capital cost over 30 years per kilowatt of installed electrical capacity

/ 298,044 kWhe e output over 40 years

= 12.9¢ per kilowatt-hour of electricity.

——————-

There was a multi-disciplinary report put together by the nuclear industry, along with governmental and non-governmental entities called the Keystone Report.

This report projected fuel and operations and maintenance costs at:

4.3¢ per kWhe for fuel and O&M. That, plus. . .

+ 12.9¢ capitalization cost

= 17.2¢ production cost (pre transmission & distribution)

+ 7.0¢ per kWhe for transmission & distribution

= 24.2¢ per kilowatt-hour to your meter

—————–

What are the implications of such a high cost to your household, and to the larger society, the U.S. in this case?

I’ll leave that up to your imagination, as you ponder that solar is currently less than half the cost, while it continues its cost plunge, energy efficiency is about one eighth the cost and wind is also about half the cost. Getting back to Victor Galinsky’s quote from the beginning, the only way in which nuclear energy can compete in the market is in a skewed way, with the U.S. Government favoring it all the way along. That in fact is how nukes have gotten as far as they have. It’s time to nuke the nuclear option!

Advertisement

SunZia: The Making of a Slave State, First Power then Transmission

Why does Arizona tolerate it? Why do its citizens tolerate it? Who benefits by creating a slave-state status for Arizona?

by Russell Lowes, http://www.SafeEnergyAnalyst.org and

Energy Chair for the Sierra Club Rincon Group, August 9, 2012

Some states in this fine nation export goods in such a way as to benefit all or many within the state. Let’s take the examples of maple syrup from Vermont, fish catch from Alaska, honey from Utah, or high-technology solutions from California. All of these examples incur some handsome benefits for many or all of the state population in export revenue. That revenue can come in the form of tax revenue or in the form of business income, and perhaps high numbers of jobs provided or even more intangible benefits, like crop pollination.

Not so with energy exports of Arizona. With more than a third of our electricity being exported, there is very little benefit to any significant population of this state. Sure there are some construction jobs that actually don’t go to out-of-state construction workers, and really do go to in-state residents. Sure there are some maintenance jobs for running these plants that also go to in-state residents of Arizona.

However, there are a scant number of jobs in coal, gas or nuclear power production. For every million invested in coal production, only 6 jobs are produced. Fossil-fuel and nuclear plants are capital intensive industries, where the money goes largely for capital-intensive power plant and construction components, many of which are produced overseas.

In contrast to 6.9 jobs for coal and 4.2 jobs per million dollars spent on nuclear energy, solar energy installation produces about 13 jobs per million dollars spent.  Whenever you put money toward low job-producing options, you deplete funds for higher jobs-producing options. To put money into coal and nukes reduces overall employment, because that money would have gone to other projects, or perhaps even just into more discretionary spending, which has a much higher jobs output than 4.2 or 6.9 jobs per million dollars spent.

Energy exports from Arizona are not taxed in any significant way that would bring further benefits to the state, except for property taxes that benefit the local areas a bit.  We do not tax the payroll that goes for power plant components from out-of-state -– and mostly out-of-country -– workers who create these parts and machinery for the coal, nuclear and natural gas plants. We do not put a sales tax on the exported energy. We do not tax the income of the out-of-state corporations like Bechtel, GE-Hitashi, Toshiba-Westinghouse or others who build these plants.

Then comes SunZia, which some think of as Sunzilla, a monster transmission facility. This system would transport electricity from coal and natural gas producing plants right through Arizona. The company behind SunZia, SouthWestern Power Group, would have you believe that the 16-story high transmission lines would primarily transmit renewable energy. However, every one of their many options for routing their transmission lines goes by a planned fossil-fuel plant in southeastern Arizona and other potential gas plants in New Mexico.

The owners of the Bowie, AZ fossil-fuel plant and SunZia apparently own no renewable energy facilities to speak of. This is a good example of green-washing, where they promise renewables and then you actually deliver dirty energy. Explicitly put, they are using renewables as a cover to deliver their dirty fossil fuel plant.

It is SouthWestern Power Group that wants to build a large natural gas plant north of the Chiracauhua Mountains, near Bowie. It would pollute the air of Chiracauhua National Monument, the Coronado National Forest lands, the Wilcox Playa and the Wilcox area. This plant is east of Tucson, toward the New Mexico boundary line.

The wind from this facility would blow pollutants to Tucson during our hot summer months. This fossil-fuel plant would pollute a large region including parts of Arizona, New Mexico and Mexico.  Of course, winds don’t stop at boundary lines, so the pollution, like all pollution of fossil and nuclear plants, would thin out and spread globally.

There is no need for this huge transmission line. Instead, there is a large precedent for energy efficiency improvement in the U.S., in the Southwest and in Arizona. The Arizona Corporation Commission, which is a top regulator for electricity and its transmission in Arizona, has established a requirement for Arizona of 22% reduction in power production in Arizona by 2020. This large electricity reduction is going to make new transmission lines much less viable. On the other hand, to build transmission lines essentially refocuses attention on production, rather than reaching our energy efficiency potential.

All the while, if Arizona were to use its energy as efficiently as California, which has focused on EE programs for a long time, it would reduce its overall electricity production by 52%!

Source: New Rules Project, Energy Self-Reliant States, October 2009, p. 27.  https://www.google.com/url?client=internal-element-cse&cx=003238738796794484078:b450fno1dzc&q=https://ilsr.org/wp-content/uploads/files/ESRS.pdf&sa=U&ved=2ahUKEwjyhrbc16XzAhXS3J4KHeyrAGgQFnoECAQQAQ&usg=AOvVaw1YiZVznXIgqJos8oSO599i

With all this energy reduction going on, why would it be beneficial to build SunZia?  It is highly beneficial for out-of-state and overseas corporations. For typical Arizona residents, it is the opposite of beneficial.

Arizona stands to lose environmental quality, and the economic negatives that go along with these environmental quality reductions. The towers and lines themselves contribute to visual blight of the beautiful natural settings of Arizona, and New Mexico. The lines will contribute to transporting more electricity from natural gas – an absolute certainty, with the tie-in to the natural gas plant near Bowie.

Economically, this is not the way to go. Many studies have been done on the average cost of natural gas electricity, on coal electricity, on wind and on the cost of energy efficiency. Here are rough cost estimates for each of these delivered electricity options, or in the case of energy efficiency, saved electricity costs:
 

Costs Per Kilowatt-Hour of Newly Constructed Power Plant Electricity Delivered or Electricity Saved
Coal               13 cents per kilowatt-hour
Natural Gas    11 cents
Nuclear           24 cents
Solar PV          6-12 cents, depending upon solar gain for each area
Wind              11 cents
Energy Saved/Efficiency   3 cents (yes, as in one eighth the cost of nuclear energy or one fourth of coal)

We have enough base load electricity generators for our current use in Arizona, regionally and nationwide, on average, already. We will have even more than enough base load electricity generation with the reduction in load that will occur with nation-wide and state-wide energy efficiency portfolios.

The least-cost approach is energy efficiency. The next least-cost approach is EE mixed with renewables that are distributed generation, in other words, renewables that are generated and distributed locally.
The federal Bureau of Land Management is the agency that is controlling this environmental impact statement (EIS) process. The Draft EIS for SunZia has been done now. It is very biased. For example it makes the claim that this line is for renewable energy transmission, without any significant justification for this claim. The BLM is clearly in cahoots with the company promoting this highly profitable but destructive energy system.

I ask the BLM to clarify what the cost is of the “no-build” option for Arizona and New Mexico, compared to the cost of the SunZia project. I want the BLM to go back to the drawing board and get perspectives on what a no-build option would ultimately do to the total energy cost outlay from the citizens of Arizona and the region. The BLM should contract with reputable firms that do not have a hand in perpetuation of the 20th Century technologies of coal, nuclear and natural gas electricity production. They should consider companies like Synapse, the New Rules Project and others that are not enmeshed in the technologies of the past.

The BLM knows that this system has variable boundaries, as electricity marries electricity, once it gets on the western grid system. However, the BLM also knows that it can reasonably quantify what electricity will cost with a system that is unneeded versus what it will cost with a grid system that is not unnecessarily expanded. The BLM knows that if we put the energy dollars into energy efficiency and distributed generation renewables, the overall cost of energy to citizens in the West will be lower.

So, is Arizona headed to becoming a resource-depleted slave state, a third-world country-like state? Is this beautiful state going to be beholden to outside interests that profit from this potential deterioration? Or is Arizona going to start taking the reins in hand and steer away from this outside domination?

Do we want to go down the tired path of fossil and nuclear energy, or do we want to ramp up our energy efficiency and blend it with renewables, cleaning our environment and reaping economic benefits of cheaper energy costs and more jobs?

A deadline of August 22nd has been set for this important phase of opposition to this project.

To let the BLM know what you think about this project, you can go online to download a comment form at:  http://www.blm.gov/pgdata/etc/medialib/blm/nm/programs/more/lands_and_realty/sunzia/sunzia_docs.Par.1056.File.dat/SunZia-Comment_FINAL.pdf
This form has directions on where to send it, or you can e-mail your comments to: NMSunZiaProject@blm.com
You can also obtain a good perspective on this project at the website of the Cascabel Working Group, where you can obtain the Draft Environmental Impact Statement (in numerous pieces, several hundred pages of primary sections and addendums) at: http://cascabelworkinggroup.org/links.html

CO2 Emissions Will be Higher for Nuclear Power than for Coal

by Russell Lowes, March 9, 2008

It is Just a Matter of Time. . . and It is Just a Matter of Counting the Whole Nuclear Cycle

In one of the comments on my last blog, Tasha Nelson insists in a questioning way, “I would imagine nuclear power still emits far fewer greenhouse gases overall.” This is the conventional thinking. . . thinking that will hit a hard wall of thought revolution. Over the next decade or so, reassessment of economically mined uranium reserves will come into clearer focus.

By then there will be a small number of reactors being built around the globe, as the industry tries to keep pace with the number of reactors that are being retired, UNLESS the industry gets the full support of the U.S. and world governments, with additional massive subsidy, on the order of hundreds of billions, if not trillions, of dollars.

If complete socialization for nuclear power happens, no one knows how many reactors will be built. If this happens, while we will have a socialistic system for nuclear energy, we will not be able to afford it for any other energy industry, such as solar. We would have a system where the cost of money would be hidden from sight, causing all sorts of irrational decisions to come into play. The general public would pay the cost of this irrationality in the long run.

In either event, the nuclear industry will be trying to play catch-up. Reactors have already started to drop off. Of the 439 reactors we currently have, globally, they will be retiring quicker than they are being built (without a massive global subsidization). In fact, a leveling off of the number of reactors worldwide is already starting. See the graph below:

Frogattnuclen1

But, back to the question at-hand:

In a nutshell, won’t nuclear energy generate less CO2 than coal and other sources? There has been some serious work on this issue. On the other hand, there has been some self-serving nuclear industry work on this issue. With much of the industry’s estimates, there is a circular logic where the reports cite each other, with information generated by the industry that is, at best, an optimistic interpretation of the data. In the realm of independent studies, the most detailed and documented work I have obtained is at http://www.stormsmith.nl

This work, done by two analysts named Jan Willem Storm van Leeuwen and Phillip Smith, has been peer-reviewed. It is collaborated by other works. From what I can tell, it is only disagreed with to any significant degree by nuclear industry-affiliated entities. For example, there is the nuclear trade group, the World Nuclear Association, which ironically gives itself the byline, Clean Air Energy. Their study is very brief, and has nowhere near the quality level of documentation. The legitimate independent studies that review Storm and Smith only tend to agree on the major points, with less significant points of disagreements here and there.

Storm & Smith conclude:
– In the short term, nuclear power is much cleaner than all fossil fuels, if you don’t count the energy required over the next million years (the EPA required waste management period), However,
– In the long term, nuclear power will become dirtier and dirtier, emitting more and more  greenhouse gas emissions, as we quickly deplete our uranium reserves.
– The U.S. currently imports over 90% of its uranium, and only has 7% of the world’s diminishing reserves.
– Going down to lower-grade ores will deplete the short-term net energy gain of nuclear power, and at some point push this short-term gain into the negative realm, with greenhouse gas (GHG) production going through the roof. To give you a graphic illustration, uranium mining of granite would require about 50 times the weight of coal that is mined per kilowatt-hour produced.
– After about 70 years, the ore that can be economically mined (using short-term thinking) will run out – and this is on the basis of current capacity, not expanded levels of world nuclear capacity.

The above second point gets to the last point that Tasha made in her post. She asks, “Also-hasn’t there been an underinvestment in uranium mine development the past 20 years or so, leading to some of the shortfalls we are seeing now?” The answer to that depends on perspective. The industry has numerous mines that were supposed to be in operation by now. This includes the largest planned new mine, under preliminary development in Canada. It just flooded with water last year, putting off its opening for years. The easiest mining has already occurred. From one perspective, the industry is feeling the reduction of higher grade ores and cannot easily keep up with the demand.

When I first started writing on nuclear power and alternatives, back in the late 1970s, the typical quality of ore was higher than that mined today. Back then, it was common to mine ore that was 2500-3000 parts per million. Today the average is around 1500. To further compound the problems, back then, there was a lot of soft rock ore being mined. Soft rock is easier to mine than hard rock for the obvious reason that it is easier to crush. It takes less energy. Today, more and more hard rock is being mined. The twin problems are decreases in ore grade plus the harder-to-process rock.

Then, there is a third problem, and that is access to the ore itself. About 50% of the current mined uranium comes from below surface mining, going deeper and deeper. The lowest apples have been picked.

It is also true, as Tasha suggests, that there hasn’t been enough investment in mining. One question comes to mind: who is responsible for that? However, this question is irrelevant in a way. What is the current shortfall in mining? The current mining levels are at about 50 kilo-tonnes (kt) of ore per year. The current usage of ore by nuclear reactors is about 67 kt per year. Over recent years, the industry has augmented this shortage of production with ore reserves and other smaller sources like mixed oxide fuels and conversion of weapons stocks to commercial stocks, particularly from Russia. At the rate we are using up these stocks, if mining does not jump significantly, complete depletion of stocks will occur by 2015 at the latest. The price of uranium will skyrocket. So much for “cheap” nuclear fuel of days gone by.

There is a final thing to add to this. Nobody wants to hear this. It is avoided like the proverbial elephant in the room, avoided like the plague. The nature of nuclear waste is that it is transgenic. It is changing its own state through irradiation of all the ingredients of the waste. It is creating gases. It is creating liquids. It is also irradiating its container, changing the properties of whatever the container is made out of (with few exceptions).

What you might store as a near perfect rectangle today, could be quite a different shape in thousands of years. What this means is that it will off-gas, migrate, and as it is well known, go through periods of increased and decreased beta, gamma and alpha radiation over many centuries. Over many millennia. Someone is required by U.S. law to safeguard this waste for one million years. “Someone” is the word because no one knows who will be around for that long.

I will soon be writing a report on the cost of a million years of nuclear waste. To make a long story short, to guard that waste will clearly cost more energy input and create more greenhouse gases than any other current energy option under serious consideration.

In the long run, because of its waste, and because of its depletion of resources, nuclear energy creates more greenhouse gas than any other option. Remember these words in a few hundred thousand years, while you are just beginning to understand how to manage all this junk.